Skip to content
CalculatorBuddy

Fence Calculator

Estimate posts, panels or pickets, rails, concrete bags, accessories, and cost for connected fence runs and gates.

Maintained by CalculatorBuddy TeamEditorial methodology

ExampleSample values — edit any field to see your result.

Fence type

Results update as you type.

Fence estimate

8 posts support 5 connected sections with 1 gate opening.

Estimated result

8 posts support 5 connected sections with 1 gate opening.

Total run length
40.00ft
Fence length after gates
36.00ft
Posts
8
Fence sections
5
Panels
5
Rails
0
Concrete volume
15.71ft³
Concrete bags
27

Saved calculations stay only in this browser. Share copies a link containing your entered values.

Fence layout

Run 1: 40 feet
  • Connected runs share one corner post at each junction.
  • Two dedicated gate posts are added per gate; verify your gate hardware and local requirements.

Printable shopping list

ItemPurchase quantityEstimated cost
Posts8Not entered
Panels5Not entered
Rails0Not entered
Concrete27 bags (15.71 ft³)Not entered
Caps / fastener packs0 / 0Not entered
TotalEntered prices onlyEnter prices

Create a fence material list from up to three connected straight runs. Choose panels or individual pickets, subtract gate openings, set maximum post spacing, and estimate posts, panels or pickets, rails, user-sized post-hole concrete, accessories, and entered costs.

Formula

Connected runs share corner posts. Gate openings reduce covered fence length; the default counting rule adds two dedicated posts per gate.

covered length = sum(runs) − gate count × gate width
sections = ceil(covered length ÷ maximum post spacing)
posts = sections + 1 + 2 × gate count
panels = ceil(covered length ÷ panel width)
pickets = ceil(covered length ÷ (picket width + gap))
hole volume = posts × π × (diameter / 2)² × depth
bags = ceil(hole volume ÷ entered bag yield)

Measurement plan and assumptions

Measure each straight run between changes of direction. Do not add the same corner to both runs. Record every gate or permanent opening and check whether its posts replace or supplement nearby line posts. The diagram is schematic; it helps label runs and does not locate property lines, utilities, easements, grade changes, or code-required setbacks.

Worked example

For one 40 ft run with one 4 ft gate and an 8 ft maximum spacing, covered length is 36 ft and the calculator creates 5 sections. Its explicit gate rule counts 8 posts: 6 for the connected line plus 2 gate posts. With 8 ft panels, purchase 5 panels. For 12 in diameter × 30 in deep holes, concrete volume is about 15.71 ft³; at 0.60 ft³ per bag, that is 27 whole bags.

Before purchasing

Confirm panel width, picket face width, rail length, gate hardware, cap fit, fastener compatibility, actual concrete yield, and any corner or terminal-post detail in the selected system. Post spacing is a maximum input, so the final layout may use shorter bays. Verify boundaries, underground utilities, frost depth, wind exposure, and local requirements with the responsible authorities.

Common mistakes include double-counting shared corners, forgetting gate width, mixing nominal and actual picket width, using panel width as post spacing without checking the system, and treating a bag's weight as its concrete yield.

Examples

Picket mode

For 36 ft of coverage, 5.5 in pickets with 0.5 in gaps repeat every 6 in, so the area-based row estimate is ceil(432 ÷ 6) = 72 pickets before any project specific spare allowance.

Frequently asked questions

How are corner posts counted?
The entered runs are treated as one connected fence line. Adjacent runs share their junction post, so the calculator starts with sections plus one post rather than adding two endpoint posts for every run.
How are gate posts counted?
Gate width is removed from fence coverage and two dedicated gate posts are added per gate. Verify whether your hardware, gate type, and layout use existing terminal posts differently.
Does the calculator choose post-hole dimensions?
No. Diameter and depth are user inputs. Soil, frost, wind, fence height, local code, utilities, and the fence system can change the required footing.
Why do concrete bags round up?
The combined cylindrical hole volume is divided by the yield you enter and rounded to a whole bag. Manufacturer yield, spillage, soil collapse, and displaced post volume can change actual use.
Are labor and permits included?
No. Cost includes only the priced material rows. It excludes labor, tax, delivery, tools, permits, utility locating, demolition, and disposal.

Related calculators